You can build the schedule a little at a time. Save it as a draft whenever you want and come back later — nothing is sent to your team until you publish.
Video: How to Schedule Job Shifts (2:11)
Open the New Job form
1
Go to the Schedule page
Open Schedule from the main navigation. This is the calendar where every job, task, and time-off entry for your branch lives.
2
Click Create New, then Job
Press the Create New button in the top-right corner and choose Job from the menu. A panel titled Schedule New Job slides in from the right.
Pick the client and job
At the top of the panel you’ll choose what you’re scheduling.- Client — Start typing a name in the Search client box and pick the customer from the list. Each result shows the client’s phone number next to their name, so you can tell apart two customers who share a name.
- Job — Choose the Job for that client. If the client has only one open job, it fills in automatically. Otherwise, search and select the one you want. Each job lists its work areas and the date it was created underneath, which helps when a client has more than one job with the same name.
- Address — This fills in on its own from the job and is shown for reference.
You have to pick a Job before you can save or publish. The job is what ties the schedule to the right customer, address, and crew.
Choose the phase
Days on the schedule are grouped into phases — for example Prep, Install, and Cleanup. When the job already has a plan with phases, those phases carry over here; otherwise the job starts with a single phase you can rename. Use the Phase dropdown to pick the phase the day you’re working on belongs to. The small Phase actions menu next to it (the ⋯ button) lets you manage phases:- Add phase — start a new phase.
- Rename phase — give the selected phase a name.
- Colour — pick a colour, so each phase is easy to tell apart on the calendar.
- Move up / Move down — change the order of the phases.
- Delete phase — remove the phase and its days. A job needs at least one phase, so this is unavailable when only one is left. If any of its days were already published, you’ll be asked whether to notify the assigned team and the client about the cancellation.
Fill in the phase’s days
For each phase you can choose how to lay out its days with the toggle between Phase range and Day-by-day.Day-by-day
Each day of work is its own tab. For the selected day, fill in:- Shift Title — An optional label for the day, for example Day 1 - Smith Residence. If you leave it blank, the day is simply called “Day 1,” “Day 2,” and so on.
- Team Lead — The crew leader running the day. Pick from the list of available leads.
- Job Date — Click the date button and choose the day on the calendar.
- Start Time and End Time — Set when the shift begins and ends. A new day you haven’t set a time on yet opens at the branch’s working hours for that date — its opening time through its closing time — so most days are ready as they are. On a day the branch is closed, it opens at 6:00 AM for eight hours instead. These follow the Job Date until you pick a time of your own, so changing the date moves them to that day’s hours. See Branch Working Hours.
- Shift Notes — Optional notes for anything the crew should know about that day.
Phase range
When a phase runs the same crew across a stretch of days, Phase range fills them all in at once:- Date From and Date To — the first and last day of the phase.
- Working days — which days in that range count (for example, All days or Exclude weekends).
- Set the Team Lead and crew once, and they apply to every day the range creates.
Assign the crew
Use the Assign To field to choose who works the shift (in Phase range this is the crew for the whole range).1
Open the team picker
Click the Assign To box. You can browse people by role — Crew Member, Crew Leader, Sales Person, Ops Manager, Sales Admin, Client Coordinator, Admin, or Subcontractor — or just start typing a name in the Type to search box. Searching looks across every role at once, and each result is tagged with the role (or roles) that person holds.
2
Select your people
Check off everyone working that day. Each person is grouped under Available or Unavailable for the date and time you set, so you can see at a glance who has a conflict before you assign them.
3
Add a subcontractor if needed
Under the Subcontractor list, choose + Add subcontractor to create one on the spot. Enter their name (and an optional email and phone for notifications), then Add. They’re selected for the day right away.
Save a draft or publish
The buttons at the bottom of the panel decide what happens next.If any day ends before it starts, that day shows End must be after start and both Save Draft and Publish Job stay unavailable until it’s fixed — even when the day with the problem isn’t the one you have open. In that case a reminder reads “Another day ends before it starts. Fix its times to save.”
Save as a draft
Video: Schedule Draft Calendar Events (1:10)
Publish the job
When the schedule is ready, click Publish Job and choose what to send:- Publish all phases — publish every ready day in every phase at once (shown when the job has more than one phase).
- Publish phase name — publish the ready days of the phase you’re on.
- Publish Day 1, Publish Day 2, … — publish a single day and leave the rest as drafts.
A day can only be published once it’s complete — it needs a date, a start and end time, and at least one person assigned. Until then, that day’s publish option stays greyed out. If you can schedule for others, the person isn’t required: you can leave a day unassigned (nobody on the team) and still save or publish it, so the work is on the calendar for someone to pick up later.
Choose who gets notified
When you publish, a Customize Notifications window appears so you control who hears about it:- Notify Assigned Team — notify the people assigned to the shift. Each person hears about each day they’re on. If the job has nobody assigned on any day, there’s no team to notify, so this option doesn’t appear.
- Notify Sales Person — notify the salesperson on the job that their client’s job is on the calendar.
- Email Client — email the customer. Their primary email is filled in for you, and you can add more recipients with the Email button.
- The salesperson gets one notification per publish. When you publish several days at once, they get a single message covering all of them — for example, “3 shifts have been scheduled for your client …” — instead of one per day.
- You’re never notified about your own publish. If you’re on the crew or you’re the job’s salesperson, you won’t get a notification for the shifts you just published.
- A salesperson on the crew isn’t notified twice. When Notify Assigned Team is on, a salesperson who’s also working a day gets the crew notification for that day, not the salesperson one. If you turn off Notify Assigned Team, they get the salesperson notification for every day instead.
Edit or delete a scheduled job
To change a job you’ve already scheduled, open it again from the calendar. The same panel reopens with its days filled in, so you can adjust times, swap crew, add days, or republish. To remove it entirely, open the job and click Delete. You’ll be asked whether to notify the assigned team and the client about the cancellation before it’s removed.What’s next
View the schedule
See how to move around the calendar, switch between day, week, and month, and filter what you’re looking at.
Resolve a conflict
Learn what to do when someone you want to assign is already booked.