Skip to main content
The Expenses tab on a project is where you record what the job costs you. Each expense has a type, an amount, and a status, and you can attach receipts, tie the cost to a subcontractor, and decide whether it should reduce the crew’s bonus. The tab keeps a running total, and your expenses feed the project’s Financial Summary. The same tab also holds your Bids — the prices you collect from subcontractors. Once a bid is signed, you can charge receipts against it instead of adding fresh cost to the project. See Subcontractor bids.
Every role except Crew Member can view, add, edit, and delete project expenses. If you don’t see an Expenses tab on a project, expenses aren’t turned on for your workspace — see Feature availability.

Video: Tracking Project Expenses and Receipts (1:34)

Open the Expenses tab

1

Open the project

Open the project from the client, the same way you’d open any project.
2

Click Expenses

Select the Expenses tab. You’ll see Expense Management with every expense logged on the project, or “No expenses for this project” if nothing has been added yet. If you can view bids, an Expenses / Bids switch appears at the top of the tab — see Subcontractor bids.

Add an expense

1

Start a new expense

Click + Add Expense. Menaia first asks What is this expense for? and offers three cards:
  • Project expense — a cost the company carries, with no subcontractor attached.
  • Subcontractor, no bid — a sub you hired for this one job, without a signed bid behind it.
  • Subcontractor bid — charge the receipt against a subcontractor’s signed bid. This card is only available when the project has a signed bid and you have permission to manage bids; otherwise it’s greyed out with a one-line reason. See Charge an expense to a bid.
Pick a card and the Add Expense window opens. You can reopen this question with Back in the window’s footer.
2

Pick the expense type

In Expense Type, choose the category that fits the cost. Start typing to search the list. If the type you need doesn’t exist yet, you can create it right here — see Create an expense type as you go.
3

Pick the subcontractor (Subcontractor, no bid only)

On the Subcontractor, no bid path, choose who you paid in Subcontractor. On the other two paths there’s nothing to pick — a project expense has no sub, and a bid already names one.
4

Enter the amount and status

Type the Amount, then set the Status to Budgeted, Confirmed, or Paid. (Cancelled is reached later, from an existing expense — see Cancel an expense.)
5

Add a note and attachments (optional)

Use Note for any detail worth keeping, and drop receipts or documents into Attachments.
6

Decide whether it affects bonuses

Check Affect Bonuses only if this cost should come out of the crew’s bonus for the job. See How expenses affect crew bonuses before you turn this on. This option isn’t shown when you’re charging the receipt to a bid — a bid expense settles a commitment that already exists, so it never feeds the bonus deduction.
7

Choose the account it was paid from (QuickBooks only)

If your workspace syncs expenses to QuickBooks, a Paid from picker appears. Leave it on Default account to use the account set in your QuickBooks sync settings, or pick the specific bank or credit card account this expense was paid from. On a new expense it starts on the account you last used. See Expenses and QuickBooks.
8

Save it

Click Add Expense. The expense appears in the table and the total updates.

The fields

Create an expense type as you go

You don’t have to leave the project to add a new category.
1

Search for the type

In Expense Type, type the name you want — for example, Dumpster rental.
2

Add it

If nothing matches exactly, the list offers Add “Dumpster rental” as new type. Select it. The new type is created, selected on your expense, and available to everyone from then on.
Check the list before adding a new type — two names for the same kind of cost make your expense reports harder to read. Admins can tidy up the list later in Expense types.

Attach receipts and documents

Drag files onto the Attachments area in the expense window, or click it to choose files. You can attach images, videos, and documents.
  • On a new expense, your files upload right after the expense is saved. If an upload fails, the expense is still created and you’ll see “Expense created, but file upload failed” — open the expense and add the file again.
  • On an existing expense, add more files or use the remove control on a thumbnail. Your attachment changes are applied when you click Save Changes.
In the table, click View Attachment on a row to open that expense’s files in a viewer.

Read the expenses table

Each row in the table is one expense. The columns are:
  • Expense Type
  • Subcontractor — the sub this cost belongs to, or a dash when none. For a receipt charged to a bid, this shows the bid’s subcontractor.
  • Amount
  • Description — the note you added.
  • Created By — who logged it, with the date.
  • Last Updated — who last changed it, with the date.
  • Attachments — a View Attachment link, or a dash when there are none.
  • Status
The footer shows Total Expenses, the sum of every expense on the project except cancelled ones. When some receipts are charged to bids, the footer also splits that total into Charged to bids and Company pays, so a receipt charged to a bid isn’t double-counted as fresh project cost. On a phone, each expense shows as a card with the same details. A Cancelled expense stays in the table for the record but is dimmed, with its amount struck through, and counts for nothing — see Cancel an expense.

Change an expense’s status

You can update a status without opening the expense. Click the status in the row and pick Budgeted, Confirmed, Paid, or Cancelled. The change saves right away, and you’ll see “Status updated successfully.”
Status matters for your numbers. The project’s Financial Summary counts every expense that isn’t cancelled in its Expenses card, but Gross Profit only subtracts expenses marked Paid.

Edit an expense

1

Open the expense

Click the pencil icon on the expense’s row. The Edit Expense window opens with the current details.
2

Make your changes

Change any field, or add and remove attachments. At the top of the window, a line names what the expense is charged to — Project expense, Subcontractor, no bid, or Subcontractor bid — with a Change link that reopens the What is this expense for? chooser, so you can move the receipt between the company, a plain sub, and a signed bid.
3

Save

Click Save Changes.
If an expense type has been deactivated since the expense was logged, the expense keeps it — you can still edit other details. You just can’t switch another expense to that type.

Cancel an expense

Cancelling keeps the expense on record but takes it out of every total — the opposite of deleting, which removes it entirely. Set an expense’s Status to Cancelled, either from the status control on its row or in the Edit Expense window. A cancelled expense:
  • stays in the table, dimmed and with its amount struck through, so the history is intact;
  • drops out of Total Expenses, the project’s Financial Summary, and any crew-bonus deduction it was making;
  • stops counting against any subcontractor bid it was charged to; and
  • leaves QuickBooks if it was synced there — see Expenses and QuickBooks.
While an expense is cancelled it’s frozen: the window shows “This expense is cancelled. Change its status to edit anything else,” and only the status can be changed. Switch it back to Budgeted, Confirmed, or Paid to edit the rest or to bring it back into your totals.

Delete an expense

1

Choose the expense

Click the red trash icon on the expense’s row.
2

Confirm

The Delete expense? dialog warns that the expense will be permanently deleted. Click Delete to remove it.
The expense disappears from the table and from the project total. If it was affecting bonuses, the crew’s bonus is recalculated without it. See Soft delete for what deleting does behind the scenes.

Subcontractor bids

A bid is a price you collect from a subcontractor for one piece of work — a scope — on the project. Bids are the cost of record: you gather quotes from several subs for the same scope, sign the one you choose, and from then on charge receipts against that signed bid instead of adding fresh cost to the project. Bids share the project’s Expenses tab — switch to Bids at the top of the tab.
Viewing the Bids tab needs the expenses tab turned on plus permission to read bids. Adding and editing bids needs permission to manage bids — Admin, Ops Manager, and Sales Admin can; Sales Member, Client Coordinator, and Crew Leader can view them; Crew Member has no access. See the permissions matrix.

Read the bids list

Bids are grouped by scope, so the competing quotes for one piece of work sit together under a heading. Each group shows how many bids it holds and whether any is signed. For every bid you see the subcontractor, a status badge, and three figures:
  • Bid — the agreed price. If extras have been charged on top of a signed bid, a smaller ”+ extras” line shows underneath.
  • Charged — how much has been charged against the bid so far (shown only once the bid is signed).
  • Remaining — the price minus what’s been charged. It turns red and goes negative when more has been charged than the bid was worth, meaning the sub owes the company back.
The footer sums the signed bids only: Committed (signed only) and Remaining on signed bids.

Add a bid

1

Start a new bid

On the Bids tab, click + Add Bid. The Add Bid window opens.
2

Fill in the details

Pick the Subcontractor, choose or type a Scope, enter the Bid Amount, set the Status, and add Notes if you like. New bids start at Bid received.
3

Save

Click Add Bid. To attach the sub’s written quote or the signed subcontract, open the bid again with Edit and add files under Documents.
Pick an existing Scope from the list rather than retyping it. Scope groups the competing bids together, so “Deck framing” typed two slightly different ways would split one job into two.

Bid statuses

A bid moves through these statuses: Bids are closed by setting one of the last three statuses rather than deleted, so the history of who quoted what stays intact.

Signing is one bid per scope

Only one bid can be Signed for a given scope — a project commits to one price for one piece of work. If you sign a bid for a scope another signed bid already holds, Menaia warns “Another bid holds this scope” and names the current holder:
  • Sign this bid moves the other bid to Not awarded and signs this one.
  • Keep the current one leaves things as they are.
You can’t displace a signed bid that already has expenses charged to it — move or remove those charges first.

Charge an expense to a bid

Once a bid is Signed, a receipt can come off it instead of adding to project cost. When you click + Add Expense and choose Subcontractor bid:
1

Pick the bid

If the project has more than one signed bid, Menaia asks Which bid? and lists each one with its contract value and what’s still owed. With exactly one signed bid, this step is skipped.
2

Fill in the expense

Enter the expense type, amount, status, and so on as usual. The subcontractor isn’t asked — the bid already names them.
3

Say how it affects the bid

Under How does this affect the bid?, choose:
  • Comes off the bid — you paid something the sub owes, so they get paid less. By default the whole receipt comes off the bid; use Only part of it comes off the bid to split it, and the company absorbs the rest.
  • Extra on top — work beyond their price, so they get paid more. The full amount is added to what they’re owed.
A line underneath previews what the sub will be owed after this charge.
4

Save

Click Add Expense. The receipt shows under the bid’s Charged total and in the expenses table, where the footer splits Charged to bids from Company pays.
A deduction larger than what’s left on the bid is still allowed — Menaia warns that the sub would owe the company the difference, and the bid’s Remaining goes negative. To move a receipt off a bid later, open it, use Change at the top of the window, and pick a different target.

How expenses affect crew bonuses

Crew bonuses come from finishing a job in fewer hours than the estimate allowed. The hours saved create a bonus pool for the job, and the pool is split among the crew by the hours each person worked. Your crew can follow their share in their Wallet. When you check Affect Bonuses, the expense comes out of that pool before it’s split:
  • The amount taken out is the expense amount times the portion you chose. A $400 expense at **50%** takes $200 out of the pool.
  • Everyone shares the cost in proportion to their hours, just as they share the bonus.
  • Budgeted, Confirmed, and Paid all count. A bonus-affecting expense reduces the pool in any of those statuses. Only Cancelled takes it back out, since a cancelled cost is money that never left.
  • It applies to the project’s most recently closed job. If the project has several jobs, only the latest closed one is affected.
  • A pool can go below zero. If expenses are larger than the bonus the crew earned, their payout for the job becomes a deduction.
The bonus is recalculated whenever a bonus-affecting expense is added, deleted, cancelled or un-cancelled, or has its amount or portion changed — and when you turn Affect Bonuses on or off. Crew members see the change in their Wallet.
You can only turn on Affect Bonuses once the project has a closed job with its crew’s hours recorded. Otherwise the expense won’t save, and you’ll see “Unable to save expense. No job exists to affect bonus payouts.” or “Unable to save expense. Missing the information needed to apply a bonus impact.” Leave the box unchecked for now and edit the expense once the job has closed.
Bonuses stop changing once a job is past the Bonus Payout Cutoff (Days) set in your branch configuration, counted from the day the job closed. A bonus-affecting expense added or changed after that point is saved, but it no longer changes anyone’s payout. Jobs whose estimate has no labor hours don’t earn a bonus, so there’s nothing for an expense to reduce.

Expenses and QuickBooks

If your workspace has connected QuickBooks and turned on Expense Sync, Menaia sends your project expenses to QuickBooks for you:
  • Only Paid expenses reach QuickBooks. A sync records money that has actually left the bank, so a Budgeted or Confirmed expense stays in Menaia and nothing is sent yet.
  • Marking an expense Paid creates or updates a matching expense in QuickBooks. It’s recorded against the project’s client, categorized under an expense account named after the expense type, and paid from the account named in the Paid from picker.
  • Paid from decides the account. Each expense is recorded against the bank or credit card account you pick in Paid from. Leaving it on Default account uses the account set in your QuickBooks sync settings. The picker starts on the account you last used, so the account you log most expenses from is already selected.
  • Moving an expense off Paid — back to Budgeted or Confirmed, or to Cancelled — removes it from QuickBooks again. The Sync Log notes why (“Removed from QuickBooks because this expense is no longer Paid in Menaia. It goes back when it is marked Paid again,” or, for a cancellation, “Removed from QuickBooks because this expense was cancelled in Menaia”). Mark it Paid again and a fresh entry is created.
  • Deleting a Paid expense that has already synced also deletes it in QuickBooks.
  • A missing or unusable account stops that expense. If the account can’t be used — it was left on Default account but no default account is set, or the chosen account no longer exists in QuickBooks, is inactive there, or isn’t a bank or credit card account — nothing is sent and the expense shows a warning in the QuickBooks Sync Log explaining which. Pick another account in Paid from (or set the default in your sync settings), then save the expense to try again.
To turn expense sync on or off, or change the default account expenses are paid from, see Integrations.

What’s next

Expense types

Create, rename, and deactivate the categories your team picks when logging expenses.

Wallet

See how bonuses — and bonus deductions — show up for each crew member.